Due to extremely cold temperatures, we postponed our groundbreaking for the APA Draper High School. Watch the website for information coming soon on a reschedule date!
UCA Board Meeting
Utah Charter Academies will hold its monthly board meeting today at 4:30 at the West Valley 2 campus.
School Land Trust Meetings
Our School Land Trust committees have several up coming meetings. Agendas and other douments for these meetings can be found here.
Draper 1 – 1/22/2015 @ 2:00p
Draper 2 – 1/13/2015 @ 1:00p
Draper 3 – 1/19/2015 @ 10:00a
School in Session Today!
Please drive safely and slowly to school today. Tardies will be excused.
Back To School!
Dear Parents and Students,
We are so excited to be at the beginning of another amazing year at American Prep! We have been busy preparing our school to ensure a wonderful experience for your student(s) this year.
You will recall that at the end of last year, parents were invited to fill out a Parent Survey. We had a 3rd party collate all of those responses, and we spent significant time this summer reviewing our parent feedback. We have made several substantive changes as a result of your feedback. Thank you for your willingness to share your ideas and thoughts!
- A building addition has been approved and financed and will house new art space, choir space, and additional classroom space at West Valley 2. Construction should begin in October and be completed by February or so. We are very excited for these additions to our school!
- The Draper 1 playground is undergoing a “facelift”. The basketball court will be refinished, and four new pieces of playground equipment are on their way for installation. We anticipate this being completed by the end of September.
- The Draper 1 parking lot is being refinished, a new carpool drop-off/pick-up area has been created in the back of the school, and a new west parking lot is going in! This is VERY exciting and will greatly improve our traffic flow!
- The Draper 2 facility has undergone some changes this summer! We have done some remodeling upstairs to create more classroom space for our additional students in our high school.
- We are still seeking to have access to 11950 South in Draper so that we can have a smoother carpool process, and so that we can move forward on seeking to build a high school. Legal proceedings have begun to gain that access, though the wheels of justice turn ever-so-slowly. Thank you for your patience.
- The soccer field has been financed and approvals and permits are in process!
- We have had a lot of feedback regarding Reading University (RU). As a result, Reading University has been altered in several ways. We now will allow students to choose one book per term that is “off-list”. Also, students may count books read to them in all grades (with some stipulations for secondary students). We are also working to increase the books on the RU list (we’d love some volunteer parent readers!). RU lists are easily found on our new website, under each campus site.
- Our Utah campuses allow Friday Casual Uniform Day – due to parent requests students may wear navy polos on Fridays and forego the ties. Staff also may wear collared shirts on Fridays without ties.
- Homework loads – we have done quite a bit of reading, listening and consulting on this topic. We received a WIDE RANGE of parental input on this topic, from parents who feel their children could do more, to parents who feel their children are over-loaded. So we feel it is important to increase the opportunity parents have to report homework loads to the school staff so that we can adjust as needed based on real homework-load data. We have developed ways to record homework completion times on learning plans (elementary) and in planners (secondary). We have also asked secondary teachers to list how long they anticipate a homework assignment should take, along with the assignment itself, so students can begin to align their efforts to the expectation, and so parents and students can let teachers know if their estimates are inaccurate. We will continue to report back to parents on this topic as the year progresses.
- Our Vegas 1 facility (Oakey) has been improved with portable facilities. Our students will now receive instruction in air conditioned units instead of tents outside! The bathrooms at Vegas 1 have also been renovated
- Our Vegas 2 facility will be our most efficient building yet! Over the years as we receive feedback and observational data from our day-to-day processes, we have been able to build more and more efficient buildings that provide a better and better atmosphere for our students and staff.
Parents – it is our aim to make our school the best possible experience for your student(s)! Thank you for providing feedback and ideas to assist us in our efforts!
APA – Las Vegas Update
American Preparatory Academy – Las Vegas is on track to start at their new campus this fall.
It will be located in the south-western area of Las Vegas near Durango and Sunset
The actual site is in the UNLV Harry Reid Research and Technology park. Currently it is a lonely building in this park and only mild growth is planned in the area.
The foundation is in and the walls are being built, brick by brick. Even though the financing on the building was just recently secured, Boyd Martin Construction was able to begin work on the building early in the year thanks to generous investors who were willing to take on extra risk so that our building would be ready for our students this Fall.